Project Highlight
													LOCATION
Sungai Padas
													TOTAL CAPACITY
144 MW
													ANNUAL GENERATION
825,673 MWh
													CARBON AVOIDANCE
422,744.576 tCO2
Padas One Project Specification
													DESIGN FLOW
43 m3/s
													GROSS HEAD
130 m
													CATCHMENT AREA
252 km²
													WATERWAY LENGTH
10.6 km
													STATUS
Construction
Padas Two Project Specification
													DESIGN FLOW
34.2 m3/s
													GROSS HEAD
263 m
													CATCHMENT AREA
91 km²
													WATERWAY LENGTH
10 km
													STATUS
Construction
Padas Three Project Specification
													DESIGN FLOW
31.5 m3/s
													GROSS HEAD
80 m
													CATCHMENT AREA
920 km²
													WATERWAY LENGTH
8.2 km
													
