Oriole Padas

Project Highlight

LOCATION

Sungai Padas

TOTAL CAPACITY

144 MW

ANNUAL GENERATION

825,673 MWh

CARBON AVOIDANCE

422,744.576 tCO2

Padas One Project Specification

DESIGN FLOW

43 m3/s

GROSS HEAD

130 m

CATCHMENT AREA

252 km²

WATERWAY LENGTH

10.6 km

STATUS

Construction

Padas Two Project Specification

DESIGN FLOW

34.2 m3/s

GROSS HEAD

263 m

CATCHMENT AREA

91 km²

WATERWAY LENGTH

10 km

STATUS

Construction

Padas Three Project Specification

DESIGN FLOW

31.5 m3/s

GROSS HEAD

80 m

CATCHMENT AREA

920 km²

WATERWAY LENGTH

8.2 km

STATUS

Construction